On the Montpellier - Clermont-Ferrand axis, south of Millau and directly on the A75: concrete and timber frame construction logistics platform with 3 cells, loading premises, offices, social premises, business premises.
Photovoltaic panels on the roof.
- Department
- Aveyron
- Desserte routière
-
A75
ground floor
- activity/warehouse
- 6,066 sqm
- technical rooms
- 30 sqm
- charging room
- 249 sqm
- Total area
- 6,345 sqm
- Independent building
- no
- General condition
- Availability
- 1st February 2026
- Type of construction
- concrete structure
- { HAUTEUR }
- from 9.0 to 9.5 m
- Floor load
- 5 t/sqm
- Coverage
- insulated steel tray multi-layer waterproofing
- Roof insulation
- Wall insulation
- concrete
- Level access
- 1
- Dockside access
- 6
- Type of heating
- unit heater
- Parking spaces
- 50 LCV
Home
Entrance hall
Services
Cafeteria
Ground floor
- 1510
- Storage of combustible materials, products or substances in covered warehouses
- Global rent before tax/sqm/year
- 42 €
- Tax regime
- VAT
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- 15 % HT du loyer HT-HC
- Rental costs
- 2.95 €/sqm
- Property tax
- 4.2 €/sqm
Laurent BEDJIDIAN

- +33 (0)4 42 10 18 38
- lbedjidian@eol.fr
pending
pending