In a strategic location at the crossroads of 3 départements, in the immediate vicinity of an industrial rail line dedicated to freight and with direct access to river traffic on the banks of the Rhône, this site offers exceptional multimodal connectivity.
Its location also provides rapid access to the A7, A9 and A54 motorways, facilitating regional, national and international trade.
The building boasts a number of high-quality features:
Photovoltaic power plant on the roof
Charging points for electric vehicles
BREEAM "Excellent" environmental certification
This site meets current requirements in terms of energy performance, sustainable mobility and logistics optimisation.
- Department
- Gard
- Desserte routière
-
A54
ground floor
- activity/warehouse
- 6,169 sqm
- offices
- 202 sqm
- Total area
- 6,371 sqm
- Independent building
- no
- General condition
- Availability
- 24 March 2026
- Type of construction
- concrete structure
- { HAUTEUR }
- 11.5 m
- Floor load
- 5 t/sqm
- Coverage
- insulated steel tray multi-layer waterproofing
- Roof insulation
- Wall insulation
- insulated double skin cladding
- Level access
- 1
- Dockside access
- 4
- Type of lighting
- LED
- Parking spaces
- 38 LCV
- Sprinkler
- Hose station
- Heavy traffic
- 1510
- Storage of combustible materials, products or substances in covered warehouses
- 1511
- Cold stores, except those used for the storage of categories of materials, products or substances otherwise covered by this nomenclature
- 2925
- Battery charging workshops
- Global rent before tax/sqm/year
- 76 €
- Tax regime
- VAT
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- contact us (barème)
- Rental costs
- contact us
- Building insurance
- included in the charges
- Management fees
- included in the charges
- Property tax
- included in the charges
Laurent BEDJIDIAN

- +33 (0)4 42 10 18 38
- lbedjidian@eol.fr