A logistics cell with five loading bays.
- Department
- Seine-et-Marne
- Zone
- LE TUBOEUF
- Desserte routière
-
A105 12 km (11 min)
A5A 17 km (14 min)
A4
N104
N19
- Gare SNCF
-
Brunoy (Ligne de Paris-Lyon à Marseille-St-Charles) 11 km (22 min)
Combs-la-Ville-Quincy (Ligne de Paris-Lyon à Marseille-St-Charles) 9 km (18 min)
- Transport en commun
-
RER : D2 "Combs-la-Ville"
- Aéroport
-
Orly 30 mn
ground floor
- activity/warehouse
- 4,150 sqm
- offices
- 50 sqm
- charging room
- 50 sqm
- Total area
- 4,250 sqm
- Independent building
- no
- General condition
- Availability
- available now
- Type of construction
- metal frame
- { HAUTEUR }
- from 10.5 to 11.0 m
- Floor load
- 6 t/sqm
- Coverage
- double-skinned insulated steel tank
- Roof insulation
- Wall insulation
- insulated double skin cladding
- Dockside access (trucks)
- 5
- Heating source
- gaz
- Type of heating
- unit heater
- Type of lighting
- incandescent lamps
On-site remote monitoring.
- Parking spaces
- 10 LCV
- Hose station
- Alarm
- Heavy traffic
Heating
Convector heating
Layout
yes with movable partitions
- Global rent before tax/year
- 297,500 €
- Global rent before tax/sqm/year
- 70 €
- Tax regime
- VAT
- Warranty deposit
- 3 months rent excl.
- Method of payment
- quarterly in advance
- Property taxes
- at the expense of the lessee
- Agent's fees (to be paid by the lessee)
- 15 % HT du loyer HT-HC
- Rental costs
- 5 €/sqm
- Property tax
- 10 €/sqm
- 77 068 095L
- 2,850 sqm
- Total area available
- 7,100 sqm
David GAGNE

- +33 (0)1 41 79 77 77
- dgagne@eol.fr
pending
pending